Dual-Gun DC Fast Charging Station | 60-120kW | AmpCorePro OLINK®
Gun Head Selection
-
CCS2 (Europe, Middle East)
-
CCS1 (North American, South Korea)
-
GBT (National Standard of China, for Export Models)
-
NACS (North America - Tesla standard)
-
ChAdeMo (Japan and parts of North America and Europe)
Certifications
OlinkProduct Parameters:

| Product Name | 60-120KW DC charging station | ||
| model | OLK-GB- | OLK-GB- | OLK-GB- |
| DCT060-01 | DCT080-01 | DCT120-01 | |
| Dimensions(mm) | 700mm*389mm*1580mm (length*width*height | ||
| human-computer interaction | 7-inch touch screen | ||
| input voltage | AC380+20%(three-phase five wire system) | ||
| Maximum input current | 116A 152A 232A | ||
| output voltage | 200V~1000VDC | ||
| output power | 60KW 80KW 120KW | ||
| Measurement accuracy | Level 0.5 | ||
| work environment | Altitude:≤2000m;Temperature:-20℃~+50℃ | ||
| Charging method | Swipe card charging,scan code charging,etc | ||
| Networking method | 4G,Ethernet(WiFi optional) | ||
| Input frequency | 50±5Hz | ||
| Protection function | Overvoltage,undervoltage,overcurrent, | ||
| short circuit,surge,leakage,etc | |||
| Charging cable length | Standard 5-meter (optional | ||
| Protection level | IP54 | ||
| Shell color | White or gray panel (optional) | ||
| humidity | 5%-95%RH(no condensation) | ||
| communication protocol | OCPP 1.6/OCPP 2.0 | ||
OlinkProduct Appearance Structure Diagram (mm):

OlinkInternal Structure Diagram of the Product:

Olink60-120kW Dual Gun Charging Stations Key Features & Benefits:
Engineered for 24/7 commercial operation, the OLINK dual-gun DC charger combines intelligent power management, robust durability, and smart connectivity to deliver maximum ROI.
Dynamic Power Distribution
Intelligent dual-gun power management automatically optimizes output based on real-time demand — full [max power] for single-vehicle fast charging, or balanced power split for two vehicles simultaneously. This increases station revenue potential and reduces driver wait times compared to fixed-power dual chargers. Multiple charging modes support diverse operational needs: Auto Full Charge, SOC-targeted, time-scheduled, and load-based dynamic adjustment.
IP54 Commercial-Grade Durability
Built with a galvanized steel enclosure and IP55-rated protection, the charger withstands harsh outdoor conditions from freezing winters to scorching summers. Multiple built-in safety mechanisms include over-voltage, under-voltage, over-current, short circuit, Type B residual current, over-temperature, surge, and lightning protection. Certified with CE, CB, UKCA, and RoHS for global compliance.
Support multiple charging methods, including QR code scanning, Swipe card, and VIN code authorization.
Smart OCPP Connectivity
Fully compliant with OCPP 1.6J and OCPP 2.0 protocols, with 4G cellular and Ethernet connectivity (WiFi optional). Cloud-based dashboard provides real-time monitoring of charging status, energy consumption, fault alerts, and revenue analytics. Remote diagnostics and OTA firmware updates reduce on-site maintenance visits, while scheduled charging and dynamic load management optimize energy costs.
Low Total Cost of Ownership
The integrated all-in-one design eliminates the need for a separate power cabinet, reducing installation costs. With high peak efficiency and power factor ≥0.99, it minimizes energy waste over the product lifecycle. OLINK's vertically integrated manufacturing ensures competitive pricing and reliable spare parts supply. Modular design reduces mean time to repair (MTTR). Typical payback period of 3-4 years for commercial operators.
Wide Vehicle Compatibility
Supports all major global charging standards including CCS1 (North America), CCS2 (Europe/Oceania), GB/T (China) and NACS (North American Tesla standard). Dual-gun configurations can mix connector types to serve diverse vehicle fleets. Customizable cable lengths and optional accessories like cable management systems, advertising displays, and POS terminals.
OEM/ODM & Factory-Direct Support
Comprehensive OEM and ODM services with MOQs starting at 50 units, including custom branding, power configurations, and software integration. 6000㎡ smart manufacturing facility with 10000 units annual capacity, 100% quality testing, and 24/7 technical support.
Applications & Industries
The OLINK dual-gun DC fast charger delivers tailored value across diverse commercial and public sector applications:
Gas Stations & Fuel Retailers
Transform your gas station into a multi-energy hub with dual-gun DC fast charging — the 60-120kW power range matches typical 15-30 minute fuel stop durations, while dual-gun capability doubles charging capacity without doubling footprint, with optional advertising displays for additional revenue.
Fleet Depots & Logistics
Ideal for delivery fleets and logistics companies — dynamic power distribution reduces peak demand charges and lowers electricity costs, while scheduled charging enables overnight off-peak strategies and OCPP integration provides centralized fleet management with usage tracking.
Hospitality & Tourism Destinations
Enhance guest experience at hotels, resorts, and tourist attractions with DC fast charging — dual-gun stations accommodate more guests with less infrastructure, quiet operation (<65dB) won't disturb the guest experience, and custom branding options match your property's visual identity.
Commercial Real Estate & Retail
Attract and retain tenants and customers with DC fast charging amenities — the dual-gun design serves more drivers per station, making efficient use of limited parking space, while 60kW charging delivers meaningful range during typical 1-2 hour shopping visits.
Highway Rest Stops & Public Charging Networks
Designed for high-traffic highway locations — 120kW max output adds 100km of range in 8-10 minutes, OCPP connectivity enables roaming network integration, and robust IP55 construction with remote monitoring ensures >98% uptime for network operators.
Industrial Parks & Business Campuses
Provide premium charging for employees and visitors while demonstrating sustainability commitment — the dual-gun configuration serves more employees with fewer stations, and scheduled charging helps manage electrical load across your campus or industrial park.
Product Comparison and Selection Guide
Product Comparison: Choosing the Right Charger
Selecting the optimal EV charger depends on your location, traffic volume, vehicle types, and budget. Here's how the OLINK dual-gun charger compares:
Dual-Gun vs. Single-Gun Chargers
|
Feature |
OLINK (120kW Dual-Gun) |
Typical Single-Gun 120kW Charger |
Typical Single-Gun 60kW Charger |
|
Max Power Output |
120kW |
120kW |
60kW |
|
Simultaneous Charging |
2 vehicles |
1 vehicle |
1 vehicle |
|
Station Throughput |
Up to 8 vehicles/hour |
Up to 4 vehicles/hour |
Up to 2 vehicles/hour |
|
Dynamic Power Distribution |
Yes |
No |
No |
|
Footprint per Charging Point |
~0.14㎡ |
~0.27㎡ |
~0.27㎡ |
|
Installation Cost per Port |
Lower (shared infrastructure) |
Higher |
Higher |
|
Best For |
High-traffic commercial locations |
Low-volume specialized use |
Low-demand locations |
Key advantages of dual-gun design:
● Higher charger utilization rate by sharing power between ports
● Lower installation cost per charging port (shared cabinet, grid connection, payment system)
● Smaller footprint per charging point, maximizing parking space efficiency
● Flexible power allocation adapts to changing demand patterns
Power Output Comparison: How Fast Can You Charge?
|
Vehicle Battery Size |
60kW DC Charger |
120kW DC Charger |
240kW Ultra-Fast |
|
50kWh (compact car) |
45 minutes (10-80%) |
25 minutes (10-80%) |
15 minutes (10-80%) |
|
75kWh (midsize SUV) |
70 minutes (10-80%) |
35 minutes (10-80%) |
20 minutes (10-80%) |
|
100kWh (large pickup/SUV) |
90 minutes (10-80%) |
45 minutes (10-80%) |
25 minutes (10-80%) |
*Note: Actual charging speeds vary by vehicle model, battery condition, temperature, and charging curve.*
Key Customization Capabilities
Hardware- Custom power outputs (30-180kW), connector types, cable lengths, display options, and enclosure branding.
Software- White-label management platform, API integration, custom protocols, billing model configurations
Volume Tiers- Sample units (1-5 units, 10-15 days), standard white-label (MOQ 50 units, 25-30 days), full OEM (MOQ 200 units, 35-45 days)
Quality- ISO 9001:2015 certified manufacturing, 100% testing, CE/CB/UKCA/RoHS compliance
FAQs About 60kW/80kW/120kW DC Fast Charging Stations
-
What is the difference between 60kW and 120kW dual-gun chargers?
-
How does dynamic power distribution work?
-
What charging connectors are compatible with this charger?
-
What are the installation requirements for a 120kW DC charger?
-
Does the charger support OCPP and network connectivity?
-
What is the minimum order quantity for wholesale?
-
What is the typical ROI for a commercial DC fast charging station?
Olink Charging Stations
SReady to Deploy High-Performance Dual-Gun DC Fast Charging?
Contact OLINK today for a customized solution and quotation tailored to your specific requirements.
Request A Quote
Contact OLINK today for a customized solution and quotation tailored to your specific requirements.










