请留言

EV DC Charging station 120-160 -180kw VoltBeaconMax Olink®

The 120-180KW DC charging station is designed for high-intensity scenarios such as highway service stations and logistics hubs, compatible with electric trucks, passenger vehicles, and commercial buses.

Supporting 5 global standards (GB/T, CCS1, CCS2, CHAdeMO, NACS), it features IP55 protection and a liquid cooling system.

Directly supplied from Chinese factories, it redefines commercial-grade energy replenishment efficiency.

  • Brand Name Olink
  • Output Current DC
  • IP Rating IP54

Gun Head Selection

  • GBT

    GBT

  • CCS2

    CCS2

  • CCS1

    CCS1

  • CHAdeMo

    CHAdeMo

  • NACS

    NACS

OlinkParameter/Specification Sheet:

high quality dc ev charger Olink® DC 120-180kw Dual Gun Integrated Type
Rated Input Voltage 380VAC±20%
Max Input Current 232A 304A 348A
Rated Output Power 120KW 160KW 180KW
Output Voltage 200-1000VDC
Communication 4G, Bluetooth, Ethernet (Optional)
User Authentication APP, RFID Card
IP Rating IP54
Charging Port GB/T 20234.2-2015, CCS, CHAdeMO, NACS
Cable Length 5 meters (can be customized)
Working Environment Altitude<2000m, Temperature:-20℃~65℃; Derating work required above 50℃
Shell Color White/Gray (Optional)
Dimension 750mm*456mm*1600mm (L*W*H)
Number of Connector 2
Display 7-inch LCD (touch screen)
Working Temperature -20℃ to 50℃
Relative Humidity 5%-95%RH (non-condensing)
Communication Protocols OCPP 1.6 / OCPP2.0
Charging Standard GB/T, CCS, CHAdeMO, NACS (Optional)
Security Protection Leakage, short-circuit, overvoltage, undervoltage, phase absence, overcurrent, reverse, lightning, grounding, over temperature, contactor adhesion, insulation detection.
Design Standard GB/T18487.1

OlinkProduct Appearance Structure Diagram (mm):

dc charger ev Olink® DC 120-180kw Dual Gun Integrated Typedc ev charging stations Olink® DC 120-180kw Dual Gun Integrated Type

OlinkDC 120-180kw Dual Gun Integrated Type Features:

- 98% peak energy efficiency + 20,000 cycle lifespan

- Five-dimensional protection (lightning/immersion/vibration/salt spray/overload)

- Dual-port intelligent power distribution (180kW single-port or 90kW×2 dual-port output)

- 4G/Ethernet dual-mode communication, supports remote firmware upgrades

Energy Efficiency Revolution

96% peak conversion rate + 5,000 cycle lifespan, with a cost per kilowatt-hour (kWh) of less than $0.018.

Heavy-Duty Protection

MIL-STD-810G military certification, featuring a six-dimensional safety shield (overload, short circuit, water immersion, vibration, salt spray, electromagnetic interference).

Smart Platform

5G + satellite dual-mode communication, pre-installed fleet management system, supporting networking and dispatching for up to 100 devices.

Extreme Output

1000V ultra-high voltage platform, commercial truck charging efficiency increased by 40% compared to traditional charging stations.

Energy Efficiency Revolution

96% peak conversion rate + 5,000 cycle lifespan, with a cost per kilowatt-hour (kWh) of less than $0.018.

Heavy-Duty Protection

MIL-STD-810G military certification, featuring a six-dimensional safety shield (overload, short circuit, water immersion, vibration, salt spray, electromagnetic interference).

Smart Platform

5G + satellite dual-mode communication, pre-installed fleet management system, supporting networking and dispatching for up to 100 devices.

Extreme Output

1000V ultra-high voltage platform, commercial truck charging efficiency increased by 40% compared to traditional charging stations.

Energy Efficiency Revolution

96% peak conversion rate + 5,000 cycle lifespan, with a cost per kilowatt-hour (kWh) of less than $0.018.

Heavy-Duty Protection

MIL-STD-810G military certification, featuring a six-dimensional safety shield (overload, short circuit, water immersion, vibration, salt spray, electromagnetic interference).

Smart Platform

5G + satellite dual-mode communication, pre-installed fleet management system, supporting networking and dispatching for up to 100 devices.

Extreme Output

1000V ultra-high voltage platform, commercial truck charging efficiency increased by 40% compared to traditional charging stations.

Unlock Exclusive Pricing

download

DC 120-180kw Dual Gun 

PDF

inquiry

Product Services & Customization:

ev charging station manufacturer - Factory office Olink®ev charging station manufacturer Olink®ev charging station manufacturer -Production workshop  Olink®ev charging station manufacturer - Workshop View Olink®ev charging station manufacturer - Workshop products Olink®ev charging stations Certificationelectric car charger manufacturer Exhibition Olink

1. How fast is the charging speed of a 120kW charging pile?

Typical charging time (based on a 60kWh battery):
20%→80%: about 15-20 minutes
0%→100%: about 30-40 minutes (speed decreases after 80%)

2. What is the price of a 180kW DC fast charging pile?

Price range: about $6,800 to $20,000 (including installation)
Operating-level charging piles are more expensive and are not recommended for home use

3. How fast is the charging speed of a 180kW charging pile?

Typical charging time (based on a 75kWh battery):
20%→80%: about 10-15 minutes
0%→100%: about 25-30 minutes

4. Is there a fourth-level charger?

There is currently no official definition of a fourth-level charging standard
In industry terminology:
● First level (home slow charging, 1-2kW)
● Second level (home/business, 7-22kW)
● Third level (DC fast charging, 50kW or higher)
The "fourth level" advertised by some manufacturers usually refers to supercharging above 350kW (such as Tesla's V4 supercharging)

5. Can a third-level charging pile be installed at home?

Generally not, for the following reasons:
Requires 380V industrial voltage, which is not supported by ordinary residences
The power is too high (50kW or higher), and the home circuit cannot withstand it
The cost is too high (equipment + power grid transformer may exceed $13,000)
Alternative: install a 7-22kW second-level charging pile (7-8 hours to fill)

6. What is the price of a fourth-level charger?

Non-standard product, if referring to supercharging above 350kW:
Single pile price: about $20,000 to $40,000
Matching cost: requires a special transformer, and the total investment may exceed $68,000
Only suitable for charging station operators, individual users do not need to consider
Comprehensive After-sale Guarantee
01

Comprehensive After-sale Guarantee

If the product is damaged or malfunctions due to poor manufacturing quality, Olink will provide free maintenance, or parts replacement.

Car charging pile after-sales support
02

Support Every Step of the Way

Olink provides training and marketing materials, fully assisting you in introducing EV charging options to your customers.

Olink Car Charging Station FAQ
03

FAQ

We are committed to providing you with detailed information about electric vehicles and charging stations and answering any questions you may have.

0102

Olink Charging Stations

Supercharge Your Business. Contact Olink Today!

Take your business to the next level with us as your partner. We bring expert knowledge in manufacturing, supply chain efficiency, and innovative R&D to improve every part of your operations— from product development to distribution. Together, we can unlock your business’s growth potential and help you become a leader in your industry.

Request A Quote