请留言

AC Level 2 Charging Station Chameleon | Olink®

Chameleon by Olink® is a compact automotive AC charging station for Type 2 EVs. With colorful design, wall-mounted form, and weatherproof housing, it’s perfect for stylish home or public charging.

  • Brand Name Olink
  • Output Current AC
  • IP Rating IP55

Gun Head Selection

  • GBT

    GBT

  • Type2

    Type2

  • J1772

    J1772

  • NACS

    NACS

OlinkParameter/Specification Sheet:

type 2 ac charging station Chameleon Olink®
Specification Details
Rated Input Voltage 220–240Vac ±20% (Single-phase) / 380Vac ±20% (Three-phase)
Rated Output Power 7kW / 11kW / 22kW
Max Input Current 32A (Single-phase) / 16A or 32A (Three-phase)
Connectivity Options Wi-Fi, 4G, Bluetooth (Optional)
Safety Protection Overcurrent, Overvoltage, Undervoltage, Leakage Protection
Protection Grade IP55, IK10
Operating Temperature -30°C to +55°C
Dimensions (L×W×H) 213.93 × 145 × 204.5 mm
Cable Length 5 meters (customizable)
AC Level 2 Charging Station Supplier | China Factory Wholesale | OLINK

OlinkProduct Appearance Structure Diagram (mm):

ac type 2 ev charging station Chameleon Olink®

OlinkChameleon – Compact Wall-Mounted Charger

Key Features: Supports cable-free configuration for minimalist, space-saving installation.
Customization Options: Bluetooth, Wi-Fi, App control, compatible with OCPP 1.6 & OCPP 2.0, reservation module.
Ideal For: Cost-sensitive applications and limited space scenarios.

Energy Efficiency Revolution

96% peak conversion rate + 5,000 cycle lifespan, with a cost per kilowatt-hour (kWh) of less than $0.018.

Heavy-Duty Protection

MIL-STD-810G military certification, featuring a six-dimensional safety shield (overload, short circuit, water immersion, vibration, salt spray, electromagnetic interference).

Smart Platform

5G + satellite dual-mode communication, pre-installed fleet management system, supporting networking and dispatching for up to 100 devices.

Extreme Output

1000V ultra-high voltage platform, commercial truck charging efficiency increased by 40% compared to traditional charging stations.

Energy Efficiency Revolution

96% peak conversion rate + 5,000 cycle lifespan, with a cost per kilowatt-hour (kWh) of less than $0.018.

Heavy-Duty Protection

MIL-STD-810G military certification, featuring a six-dimensional safety shield (overload, short circuit, water immersion, vibration, salt spray, electromagnetic interference).

Smart Platform

5G + satellite dual-mode communication, pre-installed fleet management system, supporting networking and dispatching for up to 100 devices.

Extreme Output

1000V ultra-high voltage platform, commercial truck charging efficiency increased by 40% compared to traditional charging stations.

Energy Efficiency Revolution

96% peak conversion rate + 5,000 cycle lifespan, with a cost per kilowatt-hour (kWh) of less than $0.018.

Heavy-Duty Protection

MIL-STD-810G military certification, featuring a six-dimensional safety shield (overload, short circuit, water immersion, vibration, salt spray, electromagnetic interference).

Smart Platform

5G + satellite dual-mode communication, pre-installed fleet management system, supporting networking and dispatching for up to 100 devices.

Extreme Output

1000V ultra-high voltage platform, commercial truck charging efficiency increased by 40% compared to traditional charging stations.

Unlock Exclusive Pricing

download

Chameleon | Olink® Compact Type 2 AC EV Charger with Style

PDF

inquiry
ev charging station manufacturer - Factory office Olink®ev charging station manufacturer Olink®ev charging station manufacturer -Production workshop  Olink®ev charging station manufacturer - Workshop View Olink®ev charging station manufacturer - Workshop products Olink®ev charging stations Certificationelectric car charger manufacturer Exhibition Olink
    Comprehensive After-sale Guarantee
    01

    Comprehensive After-sale Guarantee

    If the product is damaged or malfunctions due to poor manufacturing quality, Olink will provide free maintenance, or parts replacement.

    Car charging pile after-sales support
    02

    Support Every Step of the Way

    Olink provides training and marketing materials, fully assisting you in introducing EV charging options to your customers.

    Olink Car Charging Station FAQ
    03

    FAQ

    We are committed to providing you with detailed information about electric vehicles and charging stations and answering any questions you may have.

    01

    Olink Charging Stations

    Supercharge Your Business. Contact Olink Today!

    Take your business to the next level with us as your partner. We bring expert knowledge in manufacturing, supply chain efficiency, and innovative R&D to improve every part of your operations— from product development to distribution. Together, we can unlock your business’s growth potential and help you become a leader in your industry.

    Request A Quote