- Solutions
-
Products
- Level 4 EV Charging Station
- Level 3 EV Charging Station
- J1772 Charging Station
- NACS Charging Station
- CCS1 Charging Station
- CCS2 Charging Station
- Mode 4 EV Charger
- Mode 3 EV Charger
- Mode 2 EV Charger
- Level 2 EV Charging Station
- Level 1 EV Charging Station
- PV ESS EV Charging Station Wholesale
- Portable EV Charging Station
- AC Charging Station
- DC EV Charger
0102030405
7KW DC Charging Station by China Suppliers - Modular Factory Design for Commercial EV Charging Solutions
OlinkParameter / Specification Sheet:
| Voltage Range: | 176VAC ~ 264VAC |
| Input Format: | Single-phase L/N+PE |
| Rated Output Power: | 7KW |
| Protection Functions: | Overvoltage, undervoltage, overcurrent, short circuit, leakage protection, etc. |
| IP Rating: | IP54 |
| Charging Port: | GB/T 20234.2-2015 |
| Cable Length: | 3 meters (can be customized) |
| Working Environment: | Max. altitude: ≤2000m; Temperature: -20℃ ~ 50℃ |
| Dimension: | 475mm × 120mm × 304mm |
| Number of Charging Guns: | 1 |
| Working Temperature: | -30℃ to 55℃ |
| Relative Humidity: | 5% – 95% RH (non-condensing) |
| Communication Protocols: | OCPP 1.6 / OCPP 2.0 |
| Output Standard: | GB/T |
| Design Standard: | GB/T 18487.1 |
OlinkProduct Appearance Structure Diagram (mm):
OlinkDC 7kw Wall Mounted Charging Station Features:
Technological Supremacy, Direct from the Factory
- ⚡ Energy Dominance: 95% conversion efficiency + industrial-grade 10-year lifespan, with B2B operational costs per kWh of less than $0.015.
- 🛡 Safety Infrastructure: Five-dimensional protection (lightning strike, leakage, short circuit, overload, water immersion) + military-grade AI temperature control system (±1℃ precision).
- 📡 Smart Platform: 4G/Ethernet dual-mode communication, compatible with SAAS-level charging management platforms, enabling real-time monitoring of thousands of devices.
- 🔧 Flexible DNA: Direct supply from Chinese factories, with hardware protocol customization prototypes delivered within 72 hours.
Product Services & Customization:
Modular Solutions for B2B Energy Infrastructure
- 🔌 Protocol Sovereignty: Capable of loading automaker-specific protocols (e.g., Rivian 48A high-voltage fast charging) within 48 hours, with support for OTA updates to global standards.
- 🔩 Hardware LEGO: Fully modular hardware architecture for rapid configuration and deployment.
- 🔀 Connector Matrix: CCS1/Type 2/CHAdeMO interchangeable modules, supports dual-connector parallel output.
- ⚡ Power Stacking: Single-unit 7kW expandable to 22kW cluster deployment, with optional liquid cooling system.
- 🎨 Industrial Coating: Customizable RAL color chart, explosion-proof coating, and laser-etched corporate branding.
Frequently Asked Questions (FAQ)
QWhat is the rated output power of the Olink DC 7kW Wall Mounted Charging Station?
The Olink DC Small 7kW Wall Mounted Charging Station delivers a rated output power of 7KW, making it suitable for efficient and reliable EV charging in both residential and commercial environments.
QWhat communication protocols does this DC EV charger support?
The charger supports OCPP 1.6 and OCPP 2.0 protocols, ensuring seamless integration with SAAS-level charging management platforms and enabling real-time monitoring of multiple devices simultaneously.
QWhat safety protections are built into the Olink 7kW DC charger?
The unit features five-dimensional protection including lightning strike, leakage, short circuit, overload, and water immersion safeguards. It also incorporates a military-grade AI temperature control system with ±1℃ precision, and carries an IP54 ingress protection rating.
QCan the charging station be customized for specific connector types or power requirements?
Yes. The Olink DC 7kW charger supports modular customization including CCS1, Type 2, and CHAdeMO interchangeable connector modules. Power output can be scaled from 7kW up to 22kW cluster deployment. Custom RAL color coatings and laser-etched corporate branding are also available.
QWhat are the operating temperature and environmental conditions for this charger?
The charger is designed to operate in working temperatures from -30℃ to 55℃, at altitudes up to 2000m, and in relative humidity of 5%–95% RH (non-condensing), making it suitable for a wide range of outdoor and indoor deployment scenarios.
QHow quickly can Olink deliver customized hardware prototypes for B2B orders?
As a direct Chinese factory supplier, Olink can deliver hardware protocol customization prototypes within 72 hours. Automaker-specific protocol loading (e.g., Rivian 48A high-voltage fast charging) can be completed within 48 hours, with full OTA update support for global standards.






