180 KW DC EV Charging Station Olink® DC Electric Charging Stations
Gun Head Selection
-
GBT
-
CCS2
-
CCS1
-
CHAdeMo
-
NACS
OlinkParameter/Specification Sheet:

| Rated output power | 180KW |
| Rated input current | 450A |
| Output voltage range | 200~1000Vdc |
| Networking method | 4G network; Supports Bluetooth; Ethernet (optional) |
| Charging method | Swipe card charging, scan code charging |
| IP Rating | IP54 |
| Charging Port | GB/T and GB/T (Dual Guns), CCS2 and CCS2 (Dual Guns), GB/T and CCS2 (Mixed gun) |
| Cable Length | 5 meters (can be customized) |
| Working Environment | ≤ 2000m, power reduction above 2000m |
| Dimension | 700mm * 467mm * 1783.5mm |
OlinkProduct Appearance Structure Diagram (mm):

Olink180KW DC charging station Features:
● Dual charging ports, intelligent load balancing, can charge two electric vehicles at the same time
● Supports Open Charge Point Protocol (OCPP) 1.6
● LCD touch screen and simple intuitive interface
● Boot modes include plug and play, RFID, OCPP
● Supports Ethernet, 4G and Wi-Fi connections
● IP54-rated protective housing, suitable for a wide range of locations and environments
● 98% peak energy efficiency + 25,000 cycle lifespan
● Six-dimensional protection (lightning/immersion/vibration/salt spray/overload/EMC)
● Dual-port intelligent power distribution (180kW single-port or 90kW×2 output)
● 5G/fiber dual-mode communication, supports networking of thousands of devices
Energy Efficiency Revolution
96% peak conversion rate + 5,000 cycle lifespan, with a cost per kilowatt-hour (kWh) of less than $0.018.
Heavy-Duty Protection
MIL-STD-810G military certification, featuring a six-dimensional safety shield (overload, short circuit, water immersion, vibration, salt spray, electromagnetic interference).
Smart Platform
5G + satellite dual-mode communication, pre-installed fleet management system, supporting networking and dispatching for up to 100 devices.
Extreme Output
1000V ultra-high voltage platform, commercial truck charging efficiency increased by 40% compared to traditional charging stations.
Energy Efficiency Revolution
96% peak conversion rate + 5,000 cycle lifespan, with a cost per kilowatt-hour (kWh) of less than $0.018.
Heavy-Duty Protection
MIL-STD-810G military certification, featuring a six-dimensional safety shield (overload, short circuit, water immersion, vibration, salt spray, electromagnetic interference).
Smart Platform
5G + satellite dual-mode communication, pre-installed fleet management system, supporting networking and dispatching for up to 100 devices.
Extreme Output
1000V ultra-high voltage platform, commercial truck charging efficiency increased by 40% compared to traditional charging stations.
Energy Efficiency Revolution
96% peak conversion rate + 5,000 cycle lifespan, with a cost per kilowatt-hour (kWh) of less than $0.018.
Heavy-Duty Protection
MIL-STD-810G military certification, featuring a six-dimensional safety shield (overload, short circuit, water immersion, vibration, salt spray, electromagnetic interference).
Smart Platform
5G + satellite dual-mode communication, pre-installed fleet management system, supporting networking and dispatching for up to 100 devices.
Extreme Output
1000V ultra-high voltage platform, commercial truck charging efficiency increased by 40% compared to traditional charging stations.






1. Is it 180 kilowatts of fast charging?
2. How many kilowatts does the DC fast charger have?
The power range of DC fast charging is wide:
Entry-level: 50-100kW
Mid-range: 120-200kW
High-power: 250-350kW
Super fast charging: 400kW and above (such as Tesla V4 super charging station)
3. Why is DC fast charging so expensive?
The main reasons for the high cost of DC fast charging include:
● Equipment cost: High-power charging modules are expensive
● Grid connection: Requires high-voltage grid connection and transformer
● Cooling system: High-power operation requires complex cooling system
● Maintenance cost: High equipment maintenance and upgrade costs
● Electricity demand fee: High peak demand fee for commercial electricity
● Technological investment: Research and development and patent costs
4. What is the power of fast charging?
Fast charging power is divided into several levels:
● Level 1 (slow charging): 1-2kW (home socket)
● Level 2 (medium speed charging): 7-22kW (home/commercial charging pile)
● DC fast charging (Level 3): 50-350kW (public charging station)
● Super fast charging: 350kW and above (latest technology)
Olink Charging Stations
Supercharge Your Business. Contact Olink Today!
Take your business to the next level with us as your partner. We bring expert
knowledge in manufacturing, supply chain efficiency, and innovative R&D to
improve every part of your operations— from product development to distribution.
Together, we can unlock your business’s growth potential and help you become a
leader in your industry.
Request A Quote
Take your business to the next level with us as your partner. We bring expert knowledge in manufacturing, supply chain efficiency, and innovative R&D to improve every part of your operations— from product development to distribution. Together, we can unlock your business’s growth potential and help you become a leader in your industry.









